Scope:
The risk analysis principles, guidance, and implementation strategies presented in this Standard are broadly applicable; however, this Standard has been specifically developed for applications involving fixed pressurecontaining equipment and components. This Standard is not intended to be used for nuclear power plant components; see ASME BPV, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components. It provides guidance to owners, operators, and designers of pressure-containing equipment for developing and implementing an inspection program. These guidelines include means for assessing an inspection program and its plan. The approach emphasizes safe and reliable operation through cost-effective inspection. A spectrum of complementary risk analysis approaches (qualitative through fully-quantitative) should be considered as part of the inspection planning process.

Organization: ASME International
Document Number: asme pcc-3
Publish Date: 2007-01-01
Page Count: 92
Change Type: REAF
Available Languages: EN
DOD Adopted: NO
ANSI Approved: YES
Most Recent Revision: YES
Current Version: YES
Status: Active

Publication Date: 01/01/2007 - Complete Document Changes Incorporated

Description :

The risk analysis principles, guidance, and implementation strategies presented in this Standard are broadly applicable; however, this Standard has been specifically developed for applications involving fixed pressurecontaining equipment and components. This Standard is not intended to be used for nuclear power plant components; see ASME BPV, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components. It provides guidance to owners, operators, and designers of pressure-containing equipment for developing and implementing an inspection program. These guidelines include means for assessing an inspection program and its plan. The approach emphasizes safe and reliable operation through cost-effective inspection. A spectrum of complementary risk analysis approaches (qualitative through fully-quantitative) should be considered as part of the inspection planning process.

Document Type : Complete Document

Language : English

Page Count : 92

Publication Date : 01/01/2007

Revision : 07

Status : Current

Supplement : W/

Title : Inspection Planning Using Risk-Based Methods

Publication Date: 01/01/2007 - Complete Document Changes Incorporated *

Description :

This Standard provides methods for repair of equipment and piping within the scope of ASME Pressure Technology Codes and Standards1 after it has been placed in service. These repair methods include relevant design, fabrication, examination, and testing practices and may be temporary or permanent, depending on the circumstances.

The methods provided in this Standard address the repair of components when repair is deemed necessary based on appropriate inspection and flaw assessment. These inspection and flaw evaluation methods are not covered in this document, but are covered in other post-construction codes and standards.

Only technical procedures and information are provided; administrative or policy requirements are outside of the scope of this Standard.

1 Equipment and piping within the scope of ASME Pressure Technology Codes and Standards includes piping (including pipelines) and piping components (such as valves), boilers, pressure vessels (including heat exchangers), and storage tanks.

Document Type : Complete Document

Edition : Includes Errata: August 2008

Language : English

Page Count : 92

Publication Date : 01/01/2007

Revision : 07

Status : Current

Supplement : W/

Title : Inspection Planning Using Risk-Based Methods

Quick Add

$464.00
$297.00
$485.00

Please call 1-800-566-1677 for quotes on subscriptions

See More titles in ASME

See More titles in Designators