ASME NUM 1

ASME NUM 1

Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)
Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)
Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)
RULES FOR CONSTRUCTION OF CRANES, MONORAILS, AND HOISTS (WITH BRIDGE OR TROLLEY OR HOIST OF THE UNDERHUNG TYPE)
Addenda to ASME NUM-1-2000 Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)
Addenda to ASME NUM-1-2000 Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)
Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)
RULES FOR CONSTRUCTION OF CRANES, MONORAILS, AND HOISTS (WITH BRIDGE OR TROLLEY OR HOIST OF THE UNDERHUNG TYPE)
Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)

: In stock

Format
$200.00

Standard Details

Scope:
This Standard covers underhung cranes, top-running bridge and gantry cranes with underhung trolleys, travelingwall cranes, jib cranes, monorail systems, overhead 1 hoists, and hoists with integral trolleys used in nuclear facilities. All of the above cranes, whether single or multiple girder, are covered by this Standard with the exception of multiple-girder cranes with both top-running bridge and trolley, which are covered by ASME NOG-1.

Organization: ASME International
Document Number: asme num 1
Publish Date: 2016-06-30
Page Count: 162
Change Type: COMPLETE REVISION
Available Languages: EN
DOD Adopted: NO
ANSI Approved: YES
Most Recent Revision: YES
Current Version: YES
Status: Active

Preview

Publication Date: 06/30/2016 - Complete Document

Description :

This Standard covers underhung cranes, top-running bridge and gantry cranes with underhung trolleys, travelingwall cranes, jib cranes, monorail systems, overhead 1 hoists, and hoists with integral trolleys used in nuclear facilities. All of the above cranes, whether single or multiple girder, are covered by this Standard with the exception of multiple-girder cranes with both top-running bridge and trolley, which are covered by ASME NOG-1.

Document Type : Complete Document

Language : English

Page Count : 162

Publication Date : 06/30/2016

Revision : 16

Status : Current

Title : Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)

Publication Date: 01/01/2009 - Complete Document

Description :

FOREWORD

The Committee on Cranes for Nuclear Power Plants was first established in 1976. In 1980, the scope of the Committee was revised, and its name was changed to the Committee on Cranes for Nuclear Facilities. In 1983, the Nuclear Underhung and Monorail (NUM) Subcommittee was established to develop a standard to cover the design, fabrication, installation, and testing of underhung and monorail equipment used in nuclear facilities. The NUM-1 Standard is the result of the Subcommittee's work.

The first edition of ASME NUM-1 was approved by the American National Standards Institute (ANSI) on October 28, 1996. The second edition of ASME NUM-1 was approved by ANSI on May 3, 2000. The third edition of ASME NUM-1 was approved by ANSI on August 17, 2004.

This Standard, or portions thereof, can be applied to cranes, monorails, and hoists at facilities other than nuclear where enhanced equipment safety may be required, and can be provided by means of either single failure-proof features, enhanced safety features, or a seismic design.

This Standard is split into four major sections: NUM-G, General Specifications (applicable to all equipment); NUM-I, Type I equipment (i.e., equipment that is used to handle critical loads and is required to withstand a seismic event); NUM-II, Type II equipment (i.e., equipment that is not used to handle critical loads and is required to withstand a seismic event); and NUM-III, Type III equipment (i.e., equipment that is not used to handle critical loads and is not required to withstand a seismic event).

Suggestions for the improvement of this Standard arewelcome. They should be addressed to the Secretary, ASME Committee on Cranes for Nuclear Facilities, The American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990.

The 2009 edition of ASME NUM-1 was approved by ANSI on December 22, 2009.

Document Type : Complete Document

Language : English

Page Count : 160

Publication Date : 01/01/2009

Revision : 09

Status : Historical

Title : Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)

Publication Date: 01/01/2004 - Complete Document

Description :

This Standard covers underhung cranes, top-running bridge and gantry cranes with underhung trolleys, traveling wall cranes, jib cranes, monorail systems, overhead hoists, and hoists with integral trolleys used in nuclear facilities. All of the above cranes, whether single or multiple girder, are covered by this Standard with the exception of multiple girder cranes with both top running bridge and trolley, which are covered by ASME NOG-1.

Document Type : Complete Document

Language : English

Page Count : 340

Publication Date : 01/01/2004

Revision : 04

Status : Historical

Title : Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)

Publication Date: 01/01/2002 - Complete Document

Document Type : Complete Document

Page Count : 239

Publication Date : 01/01/2002

Revision : 00

Status : Historical

Title : RULES FOR CONSTRUCTION OF CRANES, MONORAILS, AND HOISTS (WITH BRIDGE OR TROLLEY OR HOIST OF THE UNDERHUNG TYPE)

Publication Date: 01/01/2002 - Amendment

Description :

The Committee on Cranes for Nuclear Power Plants was first established in 1976. In 1980, the scope of the Committee was revised, and its name was changed to the Committee on Cranes for Nuclear Facilities. In 1983, the Nuclear Underhung and Monorail (NUM) Subcommittee was established to develop a standard to cover the design, fabrication, installation, and testing of underhung and monorail equipment used in nuclear facilities. The NUM-I Standard is the result of the Subcommittee's work.

The first edition of ASME NUM-1 was approved by the American National Standards Institute on October 28, 1996.

This Standard is split into four major sections: NUM-G, General Specifications, applicable to all equipment; NUM-I, Type I equipment (i.e., equipment that is used to handle critical loads and is required to withstand a seismic event; NUM-II, Type II equipment (i.e., equipment that is not used to handle critical loads and is required to withstand a seismic event); and NUM-III, Type III equipment (i.e., equipment that is not used to handle critical loads and is not required to withstand a seismic event). A detailed Contents precedes each major section.

Suggestions for the improvement of this Standard are welcome. They should be addressed to the Secretary, ASME Committee on Cranes for Nuclear Facilities, The American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990.

The 2000 edition of ASME NUM-1 was approved by the American National Standards Institute on May 3, 2000.

Document Type : Amendment

Language : English

Page Count : 239

Publication Date : 01/01/2002

Revision : 00

Status : Historical

Title : Addenda to ASME NUM-1-2000 Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)

Publication Date: 03/31/2002 - Amendment

Description :

This Standard covers underhung cranes, top-running bridge and gantry cranes with underhung trolleys, traveling wall cranes, jib cranes, monorail systems, overhead hoists, and hoists with integral trolleys used in nuclear facilities. All of the above cranes, whether single or multiple girder, are covered by this Standard with the exception of multiple girder cranes with both top-running bridge and trolley, which are covered by ASME NOG-1.

Document Type : Amendment

Language : English

Page Count : 33

Publication Date : 03/31/2002

Revision : 00

Status : Historical

Title : Addenda to ASME NUM-1-2000 Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)

Publication Date: 09/18/2000 - Base Document

Document Type : Base Document

Language : English

Page Count : 172

Publication Date : 09/18/2000

Revision : 00

Status : Historical

Title : Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)

Publication Date: 01/01/1998 - Amendment

Document Type : Amendment

Page Count : 0

Publication Date : 01/01/1998

Revision : 96

Status : Historical

Title : RULES FOR CONSTRUCTION OF CRANES, MONORAILS, AND HOISTS (WITH BRIDGE OR TROLLEY OR HOIST OF THE UNDERHUNG TYPE)

Publication Date: 01/01/1996 - Base Document

Document Type : Base Document

Language : English

Page Count : 141

Publication Date : 01/01/1996

Revision : 96

Status : Historical

Title : Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)

Quick Add

$423.00
$289.00
$485.00