ASME B30.11

ASME B30.11

Monorails and Underhung Cranes
Monorails and Underhung Cranes - Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
MONORAIL SYSTEMS & UNDERHUNG CRANES ** INCLUDES INTERPRETATION NO. 11-18 THROUGH 11-20 **
Addenda to B30.11-1998 Monorails and Underhung Cranes
Monorails and Underhung Cranes
MONORAIL SYSTEMS & UNDERHUNG CRANES ** INCLUDES INTERPRETATION NO. 11-18 THROUGH 11-20 **
Addenda to B30.11-1993 Monorails and Underhung Cranes
Addenda to B30.11-1993 Monorails and Underhung Cranes
Addenda to B30.11-1993 Monorails and Underhung Cranes
Monorails and Underhung Cranes
MONORAIL SYSTEMS & UNDERHUNG CRANES ** INCLUDES INTERPRETATION NO. 11-18 THROUGH 11-20 **
ADDENDA TO B30.11-1988 MONORAILS AND UNDERHUNG CRANES
ADDENDA TO B30.11-1988 MONORAILS AND UNDERHUNG CRANES; ERRATA - NOVEMBER 1990
ADDENDA TO B30.11 MONORAILS AND UNDERHUNG CRANES
MONORAILS AND UNDERHUNG CRANES
MONORAILS AND UNDERHUNG CRANES
Monorail Systems and Underhung Cranes

: In stock

Format
$68.00

Standard Details

Scope:
Volume B30.11 includes provisions that apply to the construction, installation, operation, inspection, testing, and maintenance of underhung crane and monorail systems, track sections, and load-carrying members, such as end trucks or carriers (commonly called trolleys) that travel either on the external or internal lower flange of a track section. The track sections include single monorail track, crane bridge girders and jib booms, all curves, switches, transfer devices, and lift and drop sections. Provisions apply to both power-driven and handoperated equipment in which the carriers are independently controlled. Items within this scope may be referred to as "equipment."

Provisions for similar equipment used for a special purpose, such as, but not limited to, nonvertical lifting service, lifting a guided load, conveyor systems, including power and free conveyors, and lifting or transporting personnel are not included in this Volume.

NASA Lessons:
This lesson pertains to a condition on a 4 ton monorail crane at KSC used for handling flight hardware where there is no emergency power disconnect device available to the operator should the crane speed control fail. The lesson addresses the redesign of the crane control station to provide an emergency stop switch to overcome the deficiency. This lesson is relevant to paragraphs 11-1.9.5 (b) & (c) of this ASME standard.
Organization: ASME International
Document Number: asme b30.11
Publish Date: 2010-04-16
Page Count: 52
Available Languages: EN
DOD Adopted: NO
ANSI Approved: YES
Most Recent Revision: YES
Current Version: YES
Status: Active

Publication Date: 04/16/2010 - Complete Document *

Description :

Volume B30.11 includes provisions that apply to the construction, installation, operation, inspection, testing, and maintenance of underhung crane and monorail systems, track sections, and load-carrying members, such as end trucks or carriers (commonly called trolleys) that travel either on the external or internal lower flange of a track section. The track sections include single monorail track, crane bridge girders and jib booms, all curves, switches, transfer devices, and lift and drop sections. Provisions apply to both power-driven and handoperated equipment in which the carriers are independently controlled. Items within this scope may be referred to as "equipment."

Provisions for similar equipment used for a special purpose, such as, but not limited to, nonvertical lifting service, lifting a guided load, conveyor systems, including power and free conveyors, and lifting or transporting personnel are not included in this Volume.

Document Type : Complete Document

Edition : Includes Interpretations Dated May 2004 thru August 2009

Language : English

Page Count : 52

Publication Date : 04/16/2010

Revision : 10

Status : Current

Title : Monorails and Underhung Cranes

Publication Date: 01/01/2004 - Complete Document

Description :

Within the general scope defined in Section I of the introduction, ASME B30.11 applies to underhung cranes and monorail systems where load-carrying members, such as end trucks or carriers (trolleys), travel either on the external or internal (see Fig. 9) lower flange of a runway track section, single monorail track, crane bridge girder, or jib boom (see Fig. 1), including all curves, switches, transfer devices, lift and drop sections, and associated equipment. This Volume includes provisions of both power-driven and hand-operated equipment on which the carriers are independently controlled. This equipment is grouped together because of the similarity of construction and because of common considerations which are peculiar to this type of equipment. Systems used for transporting personnel require special considerations and are not included in this Volume. Also excluded from this Volume are conveyor systems, including power and free conveyors.

Document Type : Complete Document

Language : English

Page Count : 42

Publication Date : 01/01/2004

Revision : 04

Status : Historical

Title : Monorails and Underhung Cranes - Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings

Publication Date: 07/15/1999 - Complete Document

Document Type : Complete Document

Page Count : 60

Publication Date : 07/15/1999

Revision : 98

Status : Historical

Title : MONORAIL SYSTEMS & UNDERHUNG CRANES ** INCLUDES INTERPRETATION NO. 11-18 THROUGH 11-20 **

Publication Date: 07/15/1999 - Amendment

Description :

This Standard applies to the construction, installation, operation, inspection, and maintenance of jacks: power operated cranes, monorails, and crane runways; power operated and manually operated derricks and hoists; lifting devices, hooks, and slings; and cableways. The Standard does not apply to track and automotive jacks, railway or automobile wrecking cranes, shipboard cranes, shipboard cargo-handling equipment, well-drilling derricks, skip hoists, mine hoists, truck body hoists, car or barge pullers, conveyors, excavating equipment, or equipment coming within the scope of the following Committees: A10, A17, A90, A92, A120, B20, B56, and B77.

Purpose

This Standard is designed to:

(a) guard against and minimize injury to workers, and otherwise provide for the protection of life, limb, and property by prescribing safety requirements;

(b) provide direction to owners, employers, supervisors, and others concerned with, or responsible for its application; and

(c) guide governments and other regulatory bodies in the development, promulgation, and enforcement of appropriate safety directives.

Document Type : Amendment

Language : English

Page Count : 43

Publication Date : 07/15/1999

Revision : 98

Status : Historical

Title : Addenda to B30.11-1998 Monorails and Underhung Cranes

Publication Date: 06/29/1998 - Base Document

Description :

This Standard applies to the construction, installation, operation, inspection, and maintenance of jacks; power-operated cranes, monorails, and crane runways; power-operated and manually operated derricks and hoists; lifting devices, hooks, and slings; and cableways.

This Standard does not apply to track and automotive jacks, railway or automobile wrecking cranes, shipboard cranes, shipboard cargo-handling equipment, well-drilling derricks, skip hoists, mine hoists, truck body hoists, car or barge pullers, conveyors, excavating equipment, or equipment coming within the scope of the following Committees: A10, A17, A90, A92, A120, B20, B56, and B77.

Document Type : Base Document

Language : English

Page Count : 44

Publication Date : 06/29/1998

Revision : 98

Status : Historical

Title : Monorails and Underhung Cranes

Publication Date: 05/30/1997 - Complete Document

Document Type : Complete Document

Page Count : 87

Publication Date : 05/30/1997

Revision : 93

Status : Historical

Title : MONORAIL SYSTEMS & UNDERHUNG CRANES ** INCLUDES INTERPRETATION NO. 11-18 THROUGH 11-20 **

Publication Date: 05/30/1997 - Amendment

Document Type : Amendment

Language : English

Page Count : 10

Publication Date : 05/30/1997

Revision : 93

Status : Historical

Title : Addenda to B30.11-1993 Monorails and Underhung Cranes

Publication Date: 07/31/1996 - Amendment

Document Type : Amendment

Language : English

Page Count : 24

Publication Date : 07/31/1996

Revision : 93

Status : Historical

Title : Addenda to B30.11-1993 Monorails and Underhung Cranes

Publication Date: 05/01/1995 - Amendment

Document Type : Amendment

Language : English

Page Count : 12

Publication Date : 05/01/1995

Revision : 93

Status : Historical

Title : Addenda to B30.11-1993 Monorails and Underhung Cranes

Publication Date: 01/01/1993 - Base Document

Document Type : Base Document

Language : English

Page Count : 41

Publication Date : 01/01/1993

Revision : 93

Status : Historical

Title : Monorails and Underhung Cranes

Publication Date: 07/31/1992 - Complete Document

Document Type : Complete Document

Page Count : 79

Publication Date : 07/31/1992

Revision : 88

Status : Historical

Title : MONORAIL SYSTEMS & UNDERHUNG CRANES ** INCLUDES INTERPRETATION NO. 11-18 THROUGH 11-20 **

Publication Date: 07/31/1992 - Amendment

Document Type : Amendment

Language : English

Page Count : 12

Publication Date : 07/31/1992

Revision : 88

Status : Historical

Title : ADDENDA TO B30.11-1988 MONORAILS AND UNDERHUNG CRANES

Publication Date: 09/30/1990 - Amendment

Document Type : Amendment

Language : English

Page Count : 17

Publication Date : 09/30/1990

Revision : 88

Status : Historical

Title : ADDENDA TO B30.11-1988 MONORAILS AND UNDERHUNG CRANES; ERRATA - NOVEMBER 1990

Publication Date: 06/15/1989 - Amendment

Document Type : Amendment

Language : English

Page Count : 10

Publication Date : 06/15/1989

Revision : 88

Status : Historical

Title : ADDENDA TO B30.11 MONORAILS AND UNDERHUNG CRANES

Publication Date: 04/30/1988 - Base Document

Document Type : Base Document

Language : English

Page Count : 40

Publication Date : 04/30/1988

Revision : 88

Status : Historical

Title : MONORAILS AND UNDERHUNG CRANES

Publication Date: 10/15/1980 - Complete Document

Document Type : Complete Document

Language : English

Page Count : 39

Publication Date : 10/15/1980

Revision : 80

Status : Historical

Title : MONORAILS AND UNDERHUNG CRANES

Publication Date: 01/01/1973 - Complete Document

Description :

This Standard applies to the construction, installation, operation, inspection and maintenance of jacks; power operate and manually operated crane,s monorails and crane runways; power operated and manually operated derricks and hoists; lifting hooks and slings.

This Standard does not apply to track and automotive jacks, railway or automobile wrecking cranes, shipboard cranes, shipboard cargo handling equipment, well drilling derricks, skip hoists, mine hoists, truck body hoists, truck body hoists car or barge pullers, lever operated pulling devices, conveyors, excavating equipment nor to equipment coming within the scope of the following American National Standards Committees: A10, A17,, A90, A92, A113, A120, B56 and B77.

Document Type : Complete Document

Language : English

Page Count : 52

Publication Date : 01/01/1973

Revision : 73

Status : Historical

Title : Monorail Systems and Underhung Cranes

Quick Add

$423.00
$289.00
$485.00